Phase 3--Design Assessment (SAS Business Process Modules 2, 3, and 4)
FAA Order 8900.1 Flight Standards Information Management System (FSIMS) are moving...
FSIMS is undergoing a phased decommissioning and is expected to be completely retired no later than September 2022.
The FAA Order 8900.1 Flight Standards Information Management System (FSIMS) document type is currently accessible on the Dynamic Regulatory System (DRS) which will replace FSIMS.
All 8900.1s are located in the Dynamic Regulatory System (DRS) at
drs.faa.gov
Your browsers does not support IFrame's. Click here to view the contents:
HTML Document
Publication Index Card
Document Type:
8900.1
Document Title:
Phase 3--Design Assessment (SAS Business Process Modules 2, 3, and 4)
Document Status:
A
Document Owner:
AFS-300
Doc Location (URL):
Wdocs\8900.1\V02 Air Op & Agency Cert\Chapter 11\02_011_003.pdf
Point of Contact:
AFS-340
Date of Validation:
Search Keywords:
design assessment phase 3 documents compliance, phase 3, certification, initial certification
Areas Of Interest:
V2 - Air Operator, Air Agency Certification
Subject Categories:
145
-
145 - Repair Stations
145F
-
145F - Repair Stations within the United States
145G
-
145G - Repair Stations outside the United States
145H
-
145H - Repair Stations with BASA/MIP