Document Title
|
|
Approve a 14 CFR Part 121/135 Operator/Applicant’s Reliability Program/Revision
|
AT JTA 3.3.43 (AW)
|
Approve a 14 CFR Part 121/135 Operator/Applicant’s Reliability Program/Revision
|
GA JTA 3.3.43 (AW)
|
Assignment of Safety Assurance System and Non-Safety Assurance System FAA Responsibilities
|
8900.1,Vol.2,Ch1,Sec2
|
Change 353 to 8900.1 -- Dated 07/02/2014
|
8900.1,CHG353
|
Change 376 to 8900.1 -- Dated 01/13/2015
|
8900.1,CHG376
|
Change 378 to 8900.1 -- Dated 01/16/2015
|
8900.1,CHG378
|
Change 391 to 8900.1 -- Dated 04/14/2015
|
8900.1,CHG391
|
Change 480 to 8900.1 -- Dated 09/13/2016
|
8900.1,CHG480
|
Change 492 to 8900.1 -- Dated 11/09/2016
|
8900.1,CHG492
|
Change 500 to 8900.1 -- Dated 12/7/2016
|
8900.1,CHG500
|
Change 504 to 8900.1 -- Dated 12/28/2016
|
8900.1,CHG504
|
Change 539 to 8900.1 -- Dated 8/4/2017
|
8900.1,CHG539
|
Change 542 to 8900.1 -- Dated 8/10/2017
|
8900.1,CHG542
|
Change 548 to 8900.1 -- Dated 9/5/2017
|
8900.1,CHG548
|
Change 571 to 8900.1 -- Dated 1/12/2018
|
8900.1,CHG571
|
Change 579 to 8900.1 -- Dated 3/5/2018
|
8900.1,CHG579
|
Change 604 to 8900.1 -- Dated 07/27/2018
|
8900.1,CHG604
|
Change 652 to 8900.1 -- Dated 3/15/19
|
8900.1,CHG652
|
Change 653 to 8900.1 -- Dated 3/20/19
|
8900.1,CHG653
|
Change 655 to 8900.1 -- Dated 4/9/19
|
8900.1,CHG655
|
Change 689 to 8900.1 -- Dated 1/24/20
|
8900.1,CHG689
|
Change 700 to 8900.1 -- Dated 3/31/20
|
8900.1,CHG700
|
Change 702 to 8900.1 -- Dated 4/24/20
|
8900.1,CHG702
|
Editorial Updates of FY 2016 Third Quarter
|
8900.1,FY16-3Q
|
Editorial Updates of FY 2018 Third Quarter
|
8900.1,FY18-3Q
|
Evaluate a 14 CFR Part 121/135 (10 or More) Maintenance Training Program/Record/Revision
|
GA JTA 3.3.20 (AW)
|
FAA Letter to EASA
|
FAA-Resp-SD2018-2019
|
FAA Shutdown Response
|
FAA-SDResp-SD2018-2019
|
Gulfstream Aerospace Corporation G-IV -- Date 10/13/2020
|
FSB G-IV Rev 4
|
Gulfstream Aerospace Corporation G280 -- Date 09/24/2020
|
FSB G-280 Rev 6
|
Gulfstream Aerospace GIV-X (G450) (Part 125 Operations Only), Rev. 0 Date -- 06/08/2017
|
M GIV-X G450 (Part 125) R0
|
Innovative Solutions & Support Flat Panel Display System with Integrated Dual FMS and Autothrottle -- Date 09/12/2017
|
FSB OSR ISS FPDS
|
Instrument Landing System and Ancillary Electronic Component Configuration and Performance Requirements
|
6750.24_E_CHG_3
|
LLC CH-47D, Rev. 0 Date -- 03/15/2018
|
M CH-47D LLC R0
|
LR-45 Models (70 through 75), Rev. 1 Date -- 06/04/2019
|
M LR-4570-75 R1
|
Preparation of FAA Operating Certificates
|
8900.1,Vol.2,Ch1,Sec4
|
Repair Station Initial Certification Custom DCT
|
DCT RSIC V9.0
|
Safety Assurance System: Certificating/Renewing/Amending a Part 145 Repair Station Located Inside the United States Under a BASA/MIP
|
8900.1,Vol.2,Ch11,Sec9_SAS
|
Safety Assurance System: Certificating/Renewing/Amending a Part 145 Repair Station Located Outside the Territories of the United States and not Under a BASA/MIP
|
8900.1,Vol.2,Ch11,Sec10_SAS
|
Safety Assurance System: Certification of a Part 145 Satellite Repair Station, Amendment to, and/or Transfer of Certificate of the Part 145 Certification
|
8900.1,Vol.2,Ch11,Sec7_SAS
|
Safety Assurance System: Evaluate a Part 135 (Nine or Less) Certificate Holder/Applicant’s Maintenance Requirements
|
8900.1,Vol.2,Ch4,Sec8_SAS
|
Safety Assurance System: Evaluate Applicant's Refueling Procedures and Facilities (Parts 121, 125 and 135)
|
8900.1,Vol.2,Ch2,Sec5_SAS
|
Safety Assurance System: Evaluate Part 121/135 Management Personnel
|
8900.1,Vol.2,Ch2,Sec3_SAS
|
Safety Assurance System: General Information and Phase 1—Preapplication Phase
|
8900.1,Vol.2,Ch3,Sec1_SAS
|
Safety Assurance System: General Information and the Certification Process
|
8900.1,Vol.2,Ch1,Sec1_SAS
|
Safety Assurance System: Initial, Renewal, Amendment, and Approval of a Part 145 Repair Station Located in the United States Applying for an EASA Part-145
|
8900.1,Vol.2,Ch11,Sec8_SAS
|
Safety Assurance System: Initial, Renewal, or Amendment Certification of an EASA Part-145 EU-based AMO Applying for a 14 CFR Part 145 Certificate
|
8900.1,Vol.2,Ch11,Sec11_SAS
|
Safety Assurance System: Initial, Renewal, or Amendment of a Part 145 Repair Station Located Outside the Territories of the United States and Under an Agreement
|
8900.1,Vol.2,Ch11,Sec12_SAS
|
Safety Assurance System: Part 145 Repair Station Ratings and Classifications Under 14 CFR Part 145, §§ 145.59 and 145.61
|
8900.1,Vol.2,Ch11,Sec6_SAS
|
Safety Assurance System: Phase 1—Preapplication
|
8900.1,Vol.2,Ch11,Sec1_SAS
|
Safety Assurance System: Phase 1 - Preapplication
|
8900.1,Vol.2,Ch4,Sec1_SAS
|
Safety Assurance System: Phase 2—Application
|
8900.1,Vol.2,Ch3,Sec2_SAS
|
Safety Assurance System: Phase 2—Formal Application (SAS Business Process Modules 1 and 2)
|
8900.1,Vol.2,Ch4,Sec2_SAS
|
Safety Assurance System: Phase 2—Formal Application (SAS Business Process Modules 1 and 2)
|
8900.1,Vol.2,Ch11,Sec2_SAS
|
Safety Assurance System: Phase 3—Design Assessment
|
8900.1,Vol.2,Ch3,Sec3_SAS
|
Safety Assurance System: Phase 3—Design Assessment (SAS Business Process Modules 2, 3 and 4)
|
8900.1,Vol.2,Ch11,Sec3_SAS
|
Safety Assurance System: Phase 3—Design Assessment (SAS Business Process Modules 2, 3 & 4)
|
8900.1,Vol.2,Ch4,Sec3_SAS
|
Safety Assurance System: Phase 4—Performance Assessment
|
8900.1,Vol.2,Ch3,Sec4_SAS
|
Safety Assurance System: Phase 4—Performance Assessment (SAS Business Process Modules 2, 3, & 4)
|
8900.1,Vol.2,Ch4,Sec4_SAS
|
Safety Assurance System: Phase 5—Administrative Functions
|
8900.1,Vol.2,Ch11,Sec5_SAS
|
Safety Assurance System: Phase 5—Administrative Functions
|
8900.1,Vol.2,Ch3,Sec5_SAS
|
Safety Assurance System: Phase 5 - Administrative Functions
|
8900.1,Vol.2,Ch4,Sec5_SAS
|
Safety Assurance System: Procedures for Collaborating with TSA During a Security Audit for Part 145 Repair Stations (Located Within and Outside the U.S. and its Territories) Both Under and Not Under a Maintenance Implementation Procedure
|
8900.1,Vol.2,Ch11,Sec13_SAS
|
Safety Assurance System: Single Pilot, Single Pilot-in-Command, and Basic Part 135 Operations
|
8900.1,Vol.2,Ch4,Sec6_SAS
|
Title 14 CFR Part 205—Aircraft Accident Liability Insurance Requirements (Date - 10/20/2020)
|
N 8900.565
|
USA EASA 145 Set to Expire
|
FAA-EASA 145Exp
|
U.S. - Singapore Maintenance Agreement Guidance
|
US-Singapore MAG
|
U.S. - Switzerland Maintenance Guidance
|
US-SW MAG CHG 2
|