U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy |
ORDER 8400.13F |
|
Effective Date: 10/25/19 |
|
SUBJ: Procedures for the Evaluation and Approval of Facilities for Special Authorization Category I Operations and All Category II and III Operations |
This order provides guidance for all personnel in the approval of facilities for Category (CAT) I Runway Visual Range (RVR) 1800 at runways with reduced lighting, Special Authorization (SA) CAT I and all CAT II and CAT III.
With a growing emphasis on performance-based operations, different levels of operation may be authorized based on the flight equipment of a specific operator and the ground equipment available at specific runways. While certain ground facility requirements are needed to support all levels of either CAT I, CAT II, or CAT III operations, a higher category of operations may be performed on different “types” of ground equipment if the airborne equipment, crew training, or other factors offset any changes in ground facility requirements. In these situations, operations are predicated on the use of specific equipment and/or procedures, which will be required in the operator’s applicable authorization (such as an operations specification (OpSpec), management specification (MSpec), or Letter of Authorization (LOA)).
ORIGINAL SIGNED by
/s/ Robert C. Carty
Deputy Executive Director, Flight Standards Service
Paragraph Page
Chapter 1. General Information................................................................................................................. | 1-1 |
|
1. |
Purpose of This Order.................................................................................................................... |
1-1 |
2. |
Audience........................................................................................................................................ |
1-1 |
3. |
Where You Can Find This Order................................................................................................... |
1-1 |
4. |
What This Order Cancels............................................................................................................... |
1-1 |
5. |
Explanation of Changes................................................................................................................. |
1-2 |
6. |
Explanation of Appendices........................................................................................................... |
1-2 |
7. |
Background................................................................................................................................... |
1-2 |
8. |
Distribution.................................................................................................................................... |
1-3 |
9. |
Directive Feedback Information................................................................................................... |
1-3 |
|
|
|
Chapter 2. CAT I RVR 1800 Approach Operations................................................................................. | 2-1 |
|
1. |
Scope............................................................................................................................................ |
2-1 |
2. |
Requirements................................................................................................................................ |
2-1 |
3. |
Operational Approval................................................................................................................... |
2-1 |
|
|
|
Chapter 3. SA CAT I Approach Operations............................................................................................ | 3-1 |
|
1. |
Scope............................................................................................................................................ |
3-1 |
2. |
Airport Traffic Control Tower (ATCT)....................................................................................... |
3-1 |
3. |
Requirements................................................................................................................................ |
3-1 |
|
Table 3-1. Minimum Visibility Values........................................................................................ |
3-2 |
4. |
Operational Approval................................................................................................................... |
3-2 |
|
|
|
Chapter 4. Standard CAT II Approach Operations.................................................................................. | 4-1 |
|
1. |
Scope............................................................................................................................................ |
4-1 |
2. |
ATCT........................................................................................................................................... |
4-1 |
3. |
Required Lighting and Ancillary Equipment............................................................................... |
4-1 |
4. |
ILS................................................................................................................................................ |
4-1 |
5. |
IAP................................................................................................................................................ |
4-2 |
6. |
Operational Approval................................................................................................................... |
4-3 |
|
|
|
Chapter 5. SA CAT II Approach Operations........................................................................................... | 5-1 |
|
1. |
Scope............................................................................................................................................ |
5-1 |
2. |
ATCT Authorizations................................................................................................................... |
5-1 |
3. |
Runways....................................................................................................................................... |
5-1 |
4. |
Required Lighting and Ancillary Equipment............................................................................... |
5-1 |
5. |
ILS................................................................................................................................................ |
5-2 |
6. |
IAP................................................................................................................................................ |
5-2 |
7. |
Operational Approval................................................................................................................... |
5-2 |
|
|
|
Chapter 6. CAT II RVR 1000 Approach Operations............................................................................... | 6-1 |
|
1. |
Scope............................................................................................................................................ |
6-1 |
2. |
ATCT........................................................................................................................................... |
6-1 |
3. |
Required Lighting and Ancillary Equipment............................................................................... |
6-1 |
4. |
ILS................................................................................................................................................ |
6-1 |
5. |
IAP................................................................................................................................................ |
6-1 |
6. |
Operational Approval................................................................................................................... |
6-1 |
|
|
|
Chapter 7. CAT III Approach Operations................................................................................................ | 7-1 |
|
1. |
Scope............................................................................................................................................ |
7-1 |
2. |
ATCT........................................................................................................................................... |
7-1 |
3. |
Required Lighting and Ancillary Equipment............................................................................... |
7-1 |
4. |
ILS................................................................................................................................................ |
7-1 |
5. |
IAP................................................................................................................................................ |
7-2 |
6. |
Operational Approval................................................................................................................... |
7-3 |
|
|
|
Chapter 8. Responsibilities....................................................................................................................... | 8-1 |
|
1. |
Flight Standards Service (FS)....................................................................................................... |
8-1 |
2. |
Instrument Flight Procedures (IFP) Validation Team.................................................................. |
8-1 |
3. |
Technical Operations Services (AJW).......................................................................................... |
8-1 |
4. |
Air Traffic Organization (ATO) Air Traffic Services (AJT)........................................................ |
8-2 |
5. |
Regional Airports Division........................................................................................................... |
8-2 |
6. |
Aeronautical Information Services (AJV-A)................................................................................ |
8-2 |
7. |
Airports (ARP).............................................................................................................................. |
8-3 |
|
|
|
Appendix A. References........................................................................................................................... | A-1 |
|
Appendix B. Abbreviations and Acronyms.............................................................................................. | B-1 |
|
Appendix C. Sample Checklists for Evaluating Ground Facilities for SA CAT II Operations................ | C-1 |
|
Appendix D. Sample Checklists for Evaluating Ground Facilities for CAT II and CAT III
Operations........................................................................................................................... |
|
Table 3-1. Minimum Visibility Values
HAT Range |
RVR |
150-170 |
1400 |
171-185 |
1600 |
• An ALSF-2,
• HIRL,
• TDZ lighting, and
• RCL lighting.
• SSALR,
• MALSR (with threshold bar that is separate from runway end lights),
• ALSF-1/ALSF-2, and
• HIRL.
• An ALSF-2,
• HIRL,
• TDZ lighting, and
• RCL lighting.
A/FD |
Airport/Facility Directory |
AC |
Advisory Circular |
ADO |
Airport District Office |
AJV-A |
Aeronautical Information Services |
AJW |
Technical Operations Services |
ALSF |
Approach Lighting System With Sequenced Flashing Lights |
AP |
Autopilot |
ARDH |
Achieved Reference Datum Height |
ARP |
Airports |
ATC |
Air Traffic Control |
ATCT |
Airport Traffic Control Tower |
ATIS |
Automatic Terminal Information Service |
ATO |
Air Traffic Organization |
AVN |
Aviation System Standards |
AWO |
All Weather Operations |
CAT |
Category |
CFR |
Code of Federal Regulations |
CL |
Centerline |
CMO |
Certificate Management Office |
CoS |
Continuity of Service |
DA |
Decision Altitude |
DH |
Decision Height |
FAA |
Federal Aviation Administration |
FD |
Flight Director |
FGS |
Flight Guidance System |
FPO |
Flight Procedures Office |
FS |
Flight Standards Service |
FSDO |
Flight Standards District Office |
FSIMS |
Flight Standards Information Management System |
GBAS |
Ground Based Augmentation System |
GLS |
GBAS Landing System |
GP |
Glide Path |
GS |
Glideslope |
HAT |
Height Above Touchdown |
HIRL |
High Intensity Runway Lights |
HUD |
Head-Up Display |
IAP |
Instrument Approach Procedure |
ICAO |
International Civil Aviation Organization |
IFP |
Instrument Flight Procedures |
ILS |
Instrument Landing System |
IM |
Inner Marker |
LOA |
Letter of Authorization |
LOC |
Localizer |
LPV |
Localizer Performance with Vertical Guidance |
MALSR |
Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights |
MM |
Middle Marker |
MSpec |
Management Specification |
MTBO |
Mean Time Between Outages |
NAS |
National Airspace System |
NAVAID |
Navigational Aid |
NCP |
NAS Change Proposal |
NFPO |
National Flight Procedures Office |
NOTAM |
Notice to Airmen |
OFZ |
Obstacle Free Zone |
OM |
Outer Marker |
OpSpec |
Operations Specification |
RA |
Radio Altimeter |
RA NA |
Radar Altimeter Minimums Not Authorized |
RCL |
Runway Centerline |
RDH |
Reference Datum Height |
RGL |
Runway Guard Light |
RVR |
Runway Visual Range |
SA |
Special Authorization |
SIAP |
Standard Instrument Approach Procedure |
SMGCS |
Surface Movement Guidance and Control System |
SSALR |
Simplified Short Approach Lighting System with Runway Alignment Indicator Lights |
TCH |
Threshold Crossing Height |
TDZ |
Touchdown Zone |
TERPS |
Terminal Instrument Procedures |
Evaluation of the ILS Type equipment for Runway at |
||||||||||||||||
|
|
|
|
|
|
|||||||||||
AIRPORT |
CITY |
STATE |
||||||||||||||
to determine its capability to provide CAT II approach and landing minimums. |
||||||||||||||||
Date requested: |
|
|||||||||||||||
Requested by: |
|
|||||||||||||||
Airport Manager’s concurrence obtained: ................................................... |
☐ Yes ☐ No |
|||||||||||||||
CAT II minimum: |
DH |
HAT |
RVR |
|||||||||||||
Procedure was coordinated with the IFP Validation Team: ....................... |
☐ Yes ☐ No |
|||||||||||||||
All checklists are signed and all discrepancies have been resolved: .......... |
☐ Yes ☐ No |
|||||||||||||||
CAT II flight inspection completed satisfactorily: ..................................... |
☐ Yes ☐ No |
|||||||||||||||
CAT II minimum: |
DH |
HAT |
RVR |
|||||||||||||
Comments: |
||||||||||||||||
Target dates for attainment of Continuity of Service (CoS) and 14 CFR part 97 publication: |
||||||||||||||||
CAT II CoS: |
|
Target Publication Date: |
|
|||||||||||||
|
|
|
|
|
|
|||||||||||
Assigned AFS-400 Member (Print) |
Signature |
Date |
||||||||||||||
COORDINATION WITH THE FOLLOWING OFFICES: |
|||
|
DATES |
|
|
OFFICE |
PROVIDED |
RETURNED |
OK? |
Technical Operations Services (AJW): |
|
|
|
Discrepancies/Comments: |
|||
Resolution: |
|||
Air Traffic Services (AJT): |
|
|
|
Discrepancies/Comments: |
|||
Resolution: |
|||
Airports (ARP): |
|
|
|
Discrepancies/Comments: |
|||
Resolution: |
Technical Operations Checklist for SA CAT II Operations |
|||||||||||||||||
Runway: |
Airport: |
City: |
State: |
||||||||||||||
This checklist is to verify that the equipment for the runway listed above meets the requirements to provide Class II/D/2 performance in support of the proposed SA CAT II approach and landing operations. |
|||||||||||||||||
CAT II RVR 1600 (II/D/2): |
☐ Yes ☐ No |
CAT II RVR 1200 (II/D/2): |
☐ Yes ☐ No |
||||||||||||||
Confirm that all ground system requirements in FAA Order 8400.13, Chapter 5, SA CAT II Approach Operations, applicable to AJW are met. Completion of this checklist should reflect achieved/completed status, not planned actions. The checklist can be completed with items still in progress at the discretion of the assigned AFS-400 member. When all portions of this checklist are complete, please return the checklist expeditiously to the assigned AFS-400 member in order to preclude delay of CAT II service to the users. Once approval is granted, the Flight Standards Service (FS) will issue authorization for CAT II operations. |
|||||||||||||||||
I. General Information. Immediately upon initiation of this checklist, please provide the assigned AFS-400 member (listed below) with the name and telephone number of your CAT II/III coordinator for monitoring the accomplishment of your checklist. |
|||||||||||||||||
AFS-400 Member: |
Phone Number: |
||||||||||||||||
Alternate: |
Phone Number: |
||||||||||||||||
|
|||||||||||||||||
Please set monitor alarms to CAT II tolerances and initiate CoS. |
|||||||||||||||||
II. General Data. |
|||||||||||||||||
A. Facility ID: |
|||||||||||||||||
B. Glideslope (GS) Angle: degrees. |
|||||||||||||||||
C. Published Threshold Crossing Height (TCH): feet. |
|||||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||
A. Localizer (LOC) and GS equipment and array type (e.g., Mark 20 and 14 element, capture-effect, etc.) |
|||||||||||||||||
(1) LOC/array type: |
|||||||||||||||||
(2) GS equipment type: |
|||||||||||||||||
(3) Far Field Monitor installed (not required): ........................................................... |
☐ Yes ☐ No |
||||||||||||||||
B. Facility is certified for and capable of maintaining a performance classification of at least Class II/D/2 (Ref. Order 6750.24)................................................................... |
☐ Yes ☐ No |
||||||||||||||||
CAT II Monitor Start Date: |
|
CAT II Flight Inspection Date: |
|
||||||||||||||
Estimated CoS Start Date: |
|
Estimated CoS Completion Date: |
|
||||||||||||||
Commencement/Completion of CoS burn-in is not a prerequisite for checklist signature. If procedure charts prior to CoS requirements being met, a Notice to Airmen (NOTAM) must be published to N/A the procedure until burn-in is complete. |
|||||||||||||||||
C. Remote Status Monitors (LOC/GS) (Ref. Order 6750.16)......................................... |
☐ Yes ☐ No |
||||||||||||||||
Location(s): |
LOC: |
GS: |
|||||||||||||||
D. Marker Beacons: (Ref. Order 6750.16) |
|||||||||||||||||
(1) Outer Marker (OM) installed (not required): ....................................................... |
☐ Yes ☐ No |
||||||||||||||||
(2) Middle Marker (MM) installed (not required): .................................................... |
☐ Yes ☐ No |
||||||||||||||||
(3) Inner Marker (IM) installed (for “RA NA” operations): ...................................... |
☐ Yes ☐ No |
||||||||||||||||
E. Approach Light System (MALSR, SSALR, or ALSF-1/2; Ref. Order JO 6850.2) installed: ..................................................................................................................... |
☐ Yes ☐ No |
||||||||||||||||
(1) Monitored (Ref. Order 6750.24): ......................................................................... |
☐ Yes ☐ No |
||||||||||||||||
(2) Green threshold bar installed: .............................................................................. |
☐ Yes ☐ No |
||||||||||||||||
(3) Approach light system mounted on frangible fixtures: ........................................ |
☐ Yes ☐ No |
||||||||||||||||
Submit Approach Light System Plan and Profile as-built drawings to the assigned AFS-400 member for forwarding to Aeronautical Information Services (AJV) if applicable to the project. |
|||||||||||||||||
F. The LOC and GS critical areas are adequate to support CAT II/III operations: |
☐ Yes ☐ No |
||||||||||||||||
(1) Are the LOC and GS critical areas standard (Ref. Order 6750.16)? .................... |
☐ Yes ☐ No |
||||||||||||||||
(2) If critical areas are nonstandard, provide a description and attach critical area drawings:
|
|||||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||
|
|||||||||||||||||
IV. Runway Visual Range (RVR) Equipment. RVR 1600, one sensor required; RVR 1200, two sensors required; runway exceeding 8000 feet and RVR below 1600 requires midpoint RVR in addition to touchdown zone (TDZ) and rollout; CAT III operations, three sensors required. (Ref. Orders 6750.24 and 6560.10.) |
|||||||||||||||||
A. Installed in accordance with Order 6560.29: ............................................................. |
☐ Yes ☐ No |
||||||||||||||||
B. Type equipment (Make/Model): |
|||||||||||||||||
(1) Touchdown installed: ........................................................................................... |
☐ Yes ☐ No |
||||||||||||||||
(2) Midpoint installed: ............................................................................................... |
☐ Yes ☐ No |
||||||||||||||||
(3) Rollout installed: .................................................................................................. |
☐ Yes ☐ No |
||||||||||||||||
(4) Far-End installed (not required): .......................................................................... |
☐ Yes ☐ No |
||||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||
V. Electrical Power Requirements. Indicate whether the following components meet CAT II standards for backup power and power transfer (Ref. Order 6950.2). (Enter “NA” if not installed.) |
|||||||||||||||||
A. LOC ........................................................... |
☐ Yes ☐ No |
|
|||||||||||||||
B. GS .............................................................. |
☐ Yes ☐ No |
|
|||||||||||||||
C. OM ............................................................. |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||
D. MM ............................................................ |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||
E. IM .............................................................. |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||
F. RVR (Touchdown) .................................... |
☐ Yes ☐ No |
|
|||||||||||||||
G. RVR (Midpoint) ......................................... |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||
H. RVR (Rollout) ............................................ |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||
I. ALSF-1/2, SSALR, MALSR ..................... |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||
|
|||||||||||||||||
VI. Siting Standards. Confirm the following Navigational Aids (NAVAID) meet siting standards (Ref. Order 6750.16): |
|||||||||||||||||
LOC Antenna: |
☐ Yes ☐ No |
GS Mast/Antenna: |
☐ Yes ☐ No |
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||
VII. Additional Information: |
|||||||||||||||||
A. List all approved and pending National Airspace System (NAS) Change Proposals (NCP) applicable to the facilities in this checklist (ILS, approach lights, RVR, etc.): |
|||||||||||||||||
B. Indicate the AJW Systems Support Center and hours of coverage for qualified technicians on duty at the airport for this system: |
|||||||||||||||||
|
|
|
|
|
|||||||||||||
Category II/III Coordinator (Print) |
Signature |
Date |
|||||||||||||||
|
|
|
|
|
|||||||||||||
Manager or Authorized Representative, Service Area Operations Engineering Group (Print) |
Signature |
Date |
|||||||||||||||
ATO AJT Checklist for SA CAT II Operations |
|||||||||||||||
Runway: |
Airport: |
City: |
State: |
||||||||||||
This checklist is to verify that the equipment for the runway listed above meets the requirements to provide the proposed CAT II approach and landing operations. |
|||||||||||||||
CAT II RVR 1600: |
☐ Yes ☐ No |
CAT II RVR 1200: |
☐ Yes ☐ No |
||||||||||||
Completion of this checklist should reflect achieved/completed status, not planned actions. The checklist can be completed with items still in progress at the discretion of the assigned AFS-400 member. When all portions of this checklist are complete, please return the checklist expeditiously to the assigned AFS-400 member in order to preclude delay of CAT II service to the users. Once approval is granted, FS will issue authorization for CAT II operations. |
|||||||||||||||
I. General Information. Immediately upon initiation of this checklist, please provide the assigned AFS-400 member (listed below) with the name and telephone number of your staff member/point of contact for monitoring the accomplishment of your checklist. |
|||||||||||||||
AFS-400 Member: |
Phone Number: |
||||||||||||||
Alternate: |
Phone Number: |
||||||||||||||
|
|||||||||||||||
II. Category II ILS Operational Requirements: (Ref. Order JO 7210.3) |
|||||||||||||||
A. Letter of Agreement coordinated with the appropriate offices (i.e., AJW, ARP Division/District Office, FS, and Airport Authority). (Please attach copy).................................................................................... |
☐ Yes ☐ No ☐ NA |
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II operations and any planned equipment changes necessary for CAT II operations:
|
|||||||||||||||
III. Monitor Capability and Coordination. (Ref. Order 6750.24): |
|||||||||||||||
A. Verify that monitoring capability exists in the Airport Traffic Control Tower (ATCT) for: |
|||||||||||||||
(1) Localizer (LOC): ....................................................................... |
☐ Yes ☐ No |
||||||||||||||
(2) Glideslope (GS): ........................................................................ |
☐ Yes ☐ No |
||||||||||||||
(3) Inner Marker (IM) (for RA NA operations): ............................. |
☐ Yes ☐ No ☐ NA |
||||||||||||||
B. Arrangements exist for airport personnel to advise ATCT whenever the runway lighting system does not meet CAT II requirements: .............................................. |
☐ Yes ☐ No |
||||||||||||||
C. Is an approved electrical monitoring system installed in the ATCT for the approach light system? ............................................................................................. |
☐ Yes ☐ No |
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||
IV. Power Transfer. (Ref. Order 6750.24): |
|||||||||||||||
A. Arrangements exist to start engine generators for: |
|||||||||||||||
(1) RVR: ................................................................................................... |
☐ Yes ☐ No ☐ NA |
||||||||||||||
(2) Runway Lights (check all that apply): ................................... |
☐ HIRL ☐ TDZ ☐ RCL ☐ None |
||||||||||||||
(3) Approach light system and power vault (if ALSF installed): ................... |
☐ Yes ☐ No |
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||
V. Communications. |
|||||||||||||||
A. Positive Control of Aircraft and Ground Vehicles on Runway and ILS Critical Areas (Ref. AC 120-118, AC 150/5340-1, and Order JO 7110.65): ........................... |
☐ Yes ☐ No |
||||||||||||||
B. Indicate how facility outages and airport conditions (Ref. Orders JO 7110.65 and JO 7210.3) are reported (ATIS, NOTAM, etc.): .................................................. |
|
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||
|
|
|
|
|
|||||||||||
Facility Air Traffic Manager or Authorized Representative (Print) |
Signature |
Date |
|||||||||||||
Airports Division Checklist for Special Authorization CAT II Operations |
||||||||||||
Runway: |
Airport: |
City: |
State: |
|||||||||
This checklist is to verify that the equipment for the runway listed above meets the requirements to support the proposed CAT II approach and landing operations. |
||||||||||||
CAT II RVR 1600: |
☐ Yes ☐ No |
CAT II RVR 1200: |
☐ Yes ☐ No |
|||||||||
Confirm that all ground systems and obstacle clearance requirements are met. Completion of this checklist should reflect achieved/completed status, not planned actions. The checklist can be completed with items still in progress at the discretion of the assigned AFS-400 member. When all portions of this checklist are complete, please return the checklist expeditiously to the assigned AFS-400 member in order to preclude delay of CAT II service to the users. Once approval is granted, FS will issue authorization for CAT II operations. |
||||||||||||
I. General Information. Immediately upon initiation of this checklist, please provide the assigned AFS-400 member (listed below) with the name and telephone number of your staff member/point of contact for monitoring the accomplishment of the checklist. |
||||||||||||
AFS-400 Member: |
Phone Number: |
|||||||||||
Alternate: |
Phone Number: |
|||||||||||
|
||||||||||||
II. Lighting Aids. Indicate if the following visual aids meet installation standards. If a modification to an airport design standard was approved, list each approval in section VII. (Ref. AC 150/5340-30 and Order JO 6850.2) |
||||||||||||
A. High Intensity Runway Edge Lights: .......................................................... |
☐ Yes ☐ No |
|||||||||||
B. Threshold/Runway End Lights (in addition to threshold lights, which are integral to the approach light system): ........................................................ |
☐ Yes ☐ No |
|||||||||||
C. Runway Centerline (RCL) Lights (not required): ....................................... |
☐ Yes ☐ No ☐ NA |
|||||||||||
D. Runway Touchdown Zone (TDZ) Lights (not required): ........................... |
☐ Yes ☐ No ☐ NA |
|||||||||||
E. Approach Lights (MALSR, SSALR, or ALSF-1/2) (if non-Federal): |
☐ Yes ☐ No ☐ NA |
|||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
||||||||||||
|
||||||||||||
III. Monitoring of Lighting Aids. (Ref. Order 6750.24) |
||||||||||||
A. Arrangements for airport personnel to advise ATCT whenever the runway lighting system does not meet CAT II requirements: .................................. |
☐ Yes ☐ No |
|||||||||||
B. Specify the organization responsible for remote monitoring or visual inspection of lighting components. Enter “none” if not installed: |
||||||||||||
Component |
Remote Monitor |
Visual Inspection |
||||||||||
(1) Runway Edge Lights: |
|
|
||||||||||
(2) RCL Lights: |
|
|
||||||||||
(3) Runway TDZ Lights: |
|
|
||||||||||
(4) Approach Lights (if non-Federal): |
|
|
||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
||||||||||||
IV. Surface Markings and Signs Installed. (Ref. AC 150/5340-1, AC 150/5340-18, Order 6750.16, and Order JO 7110.65) |
||||||||||||
A. Precision Instrument Runway Markings: ................................................... |
☐ Yes ☐ No |
|||||||||||
B. Runway Holding Position Markings and Signs: ......................................... |
☐ Yes ☐ No |
|||||||||||
C. CAT II ILS Critical Areas Identified. ILS Critical Area Holding Position Markings and Signs: .................................................................................... |
☐ Yes ☐ No |
|||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
||||||||||||
|
||||||||||||
V. Obstacle Clearance. Certification may be obtained from the airport sponsor. |
||||||||||||
A. Is the CAT II Obstacle Free Zone (OFZ) clear of obstructions? .................. |
☐ Yes ☐ No |
|||||||||||
B. If no, describe any obstacles that penetrate the CAT II OFZ:
|
||||||||||||
C. Approach Light Area: |
||||||||||||
(1) Approach light plane clear: ..................................................................... |
☐ Yes ☐ No |
|||||||||||
(2) If light plane is not clear, describe any penetrations:
|
||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
||||||||||||
VI. Electrical Power Requirements. (Ref. Order 6950.2 and AC 150/5340-30) Verify that the following components, if installed, meet the requirement for 1-second power transfer: |
||||||||||||
A. Threshold and Runway Edge Lights: .................... |
☐ Yes ☐ No |
|||||||||||
B. RCL Lights: ........................................................... | ..
☐ Yes ☐ No ☐ NA |
|||||||||||
C. TDZ Lights: ........................................................... |
☐ Yes ☐ No ☐ NA |
|||||||||||
D. Approach Lights (if non-Federal): ......................... |
☐ Yes ☐ No ☐ NA |
|||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
||||||||||||
VII. National Standards. List all approved and planned modifications to airport national design standards regarding the proposed runway and equipment, including those related to facility frangibility:
|
||||||||||||
|
|
|
|
|
||||||||
Manager or Authorized Representative, ADO (Print) |
Signature |
Date |
||||||||||
|
|
|
|
|
||||||||
Manager or Authorized Representative, |
Signature |
Date |
||||||||||
• Block I, General Data.
• Block II, Special Authorization CAT I Operations (latest version of FAA Order 8400.13, Chapter 3).
• Block III, Special Authorization CAT II Operations (latest version of FAA Order 8400.13, Chapter 5).
• Block IV, CAT II Tolerances Met (latest version of FAA Order 8200.1, Chapter 15).
• Block V, CAT III Tolerances Met (latest version of FAA Order 8200.1, Chapter 15).
I. |
General Data |
|
A |
Location: |
|
B |
Airport: |
|
C |
Runway Number: |
|
D |
Facility ID: |
|
E |
Runway Length (ft.) / Width (ft.): |
/ |
F |
Runway Gradient % +/-: |
|
G |
Runway Surface Type: |
|
H |
Runway Grooving: |
|
I |
Glideslope (GS) Angle (degrees): |
|
J |
Requested Standard (II thru V): |
|
II. |
Special Authorization CAT I Operations |
|
A |
Localizer (LOC) #1 Performance Classification: |
|
B |
Radio Altimeter (RA) Setting Height: |
|
C |
GS Clearance Below Path: |
☐ Sat ☐ Unsat |
D |
Missed Approach: |
☐ Sat ☐ Unsat |
E |
MALSR or Better: |
☐ Yes ☐ No |
III. |
Special Authorization CAT II Operations |
|
A |
LOC #1 (CAT II/D Minimum): |
|
B |
LOC Performance Classification: |
|
C |
GS #1 (CAT II Criteria): |
|
D |
RA Setting Height: |
|
E |
RDH Crossing Height: |
|
F |
ARDH Crossing Height: |
|
G |
CAT II ILS SIAP: |
☐ Yes ☐ No |
H |
Missed Approach: |
☐ Sat ☐ Unsat |
I |
MALSR or Better: |
☐ Yes ☐ No |
IV. |
CAT II Tolerances Met |
|
A |
LOC #2 (CAT II/D Minimum): |
|
B |
GS #2 (CAT II Criteria): |
|
C |
ALSF-2 Lights: |
☐ Yes ☐ No |
V. |
CAT III Tolerances Met |
|
A |
LOC #1 (CAT III/D or III/E Minimum): |
☐ III/D ☐ III/E |
B |
LOC #2 (CAT III/D or III/E Minimum): |
☐ III/D ☐ III/E |
C |
CAT III SIAP: |
☐ Yes ☐ No |
POSITION |
DATE |
SIGNATURE |
Chief of Flight Inspection Activity |
|
|
Operations ILS Category Coordinator |
|
|
Evaluation of the ILS Type equipment for Runway at |
||||||||||||||||
|
|
|
|
|
|
|||||||||||
AIRPORT |
CITY |
STATE |
||||||||||||||
to determine its capability to provide CAT II and/or CAT III approach and landing minimums. |
||||||||||||||||
Date requested: |
|
|||||||||||||||
Requested by: |
|
|||||||||||||||
Airport Manager’s concurrence obtained: ................................................... |
☐ Yes ☐ No |
|||||||||||||||
Procedure was coordinated with the IFP Validation Team: ........................ |
☐ Yes ☐ No |
|||||||||||||||
All checklists are signed and all discrepancies have been resolved: .......... |
☐ Yes ☐ No |
|||||||||||||||
CAT II/III flight inspection completed satisfactorily: ................................ |
☐ Yes ☐ No |
|||||||||||||||
CAT II minimum: |
DH |
HAT |
RVR |
|||||||||||||
Approved for RVR 1000 autoland or HUD minimums? .......................... |
☐ Yes ☐ No |
|||||||||||||||
CAT III minimum: |
DH |
RVR |
|
|||||||||||||
Comments: |
||||||||||||||||
Target dates for attainment of Continuity of Service (CoS) and 14 CFR part 97 publication: |
||||||||||||||||
CAT II CoS: |
|
Target Publication Date: |
|
|||||||||||||
CAT III CoS: |
|
Target Publication Date: |
|
|||||||||||||
|
|
|
|
|
|
|||||||||||
Assigned AFS-400 Member (Print) |
Signature |
Date |
||||||||||||||
COORDINATION WITH THE FOLLOWING OFFICES: |
||||||
|
DATES |
|
||||
OFFICE |
PROVIDED |
RETURNED |
OK? |
|||
Technical Operations Services (AJW): |
|
|
|
|||
Discrepancies/Comments: |
||||||
Resolution: |
||||||
Air Traffic Services (AJT): |
|
|
|
|||
Discrepancies/Comments: |
||||||
Resolution: |
||||||
Airports (ARP): |
|
|
|
|||
Discrepancies/Comments: |
||||||
Resolution: |
||||||
AVIATION SYSTEM STANDARDS: |
||||||
Flight Program Operations (AJF-0): |
|
|
|
|||
Discrepancies/Comments: |
||||||
Resolution: |
||||||
Aircraft Operations (AJF‑1000): |
|
|
|
|||
Discrepancies/Comments: |
||||||
Resolution: |
||||||
Technical Operations Checklist for CAT II/III Operations |
|||||||||||||||||||
Runway: |
Airport: |
City: |
State: |
||||||||||||||||
This checklist is to verify that the equipment for the runway listed above meets the requirements to provide the required performance in support of the proposed CAT II/III approach and landing operations. |
|||||||||||||||||||
CAT II RVR 1600 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 700 (III/D/3): |
☐ Yes ☐ No |
||||||||||||||||
CAT II RVR 1200 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 600 (III/E/3) |
☐ Yes ☐ No |
||||||||||||||||
CAT II RVR 1000 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 300 (III/E/4) |
☐ Yes ☐ No |
||||||||||||||||
Confirm that all ground system requirements in Order 8400.13 applicable to AJW are met. Completion of this checklist should reflect achieved/completed status, not planned actions. The checklist can be completed with items still in progress at the discretion of the assigned AFS-400 member. When all portions of this checklist are complete, please return the checklist expeditiously to the assigned AFS-400 member in order to preclude delay of CAT II/III service to the users. Once approval is granted, the Flight Standards Service (FS) will issue authorization for CAT II/III operations. |
|||||||||||||||||||
I. General Information. Immediately upon initiation of this checklist, please provide the assigned AFS-400 member (listed below) with the name and telephone number of your CAT II/III coordinator for monitoring the accomplishment of your checklist. |
|||||||||||||||||||
AFS-400 Member: |
Phone Number: |
||||||||||||||||||
Alternate: |
Phone Number: |
||||||||||||||||||
|
|||||||||||||||||||
Please set monitor alarms to CAT II tolerances and initiate CoS. |
|||||||||||||||||||
II. General Data. |
|||||||||||||||||||
A. Facility ID: |
|||||||||||||||||||
B. Glideslope (GS) Angle: degrees. |
|||||||||||||||||||
C. Published Threshold Crossing Height (TCH): feet. |
|||||||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||||
A. Localizer (LOC) and GS equipment and array type (e.g., Mark 20 and 14 element, capture-effect, etc.) |
|||||||||||||||||||
(1) LOC/array type: |
|||||||||||||||||||
(2) GS equipment type: |
|||||||||||||||||||
(3) Far Field Monitor installed: .................................................................................. |
☐ Yes ☐ No |
||||||||||||||||||
B. Facility is certified for and capable of maintaining the required performance classification (Ref. Order 6750.24) |
☐ II/D/2 ☐ III/D/3 ☐ III/E/3 ☐ III/E/4 ☐ No |
||||||||||||||||||
(1) Facility certified and maintained to CAT II or CAT III |
☐ CAT II ☐ CAT III ☐ No |
||||||||||||||||||
CAT II/III Monitor Start Date: |
|
CAT II/III Flight Inspection Date: |
|
||||||||||||||||
Estimated CoS Start Date: |
|
Estimated CoS Completion Date: |
|
||||||||||||||||
Commencement/Completion of CoS burn-in is not a prerequisite for checklist signature. If procedure charts prior to CoS requirements being met, a Notice to Airmen (NOTAM) must be published to N/A the procedure until burn-in is complete. |
|||||||||||||||||||
C. Remote Status Monitors (LOC/GS) (Ref. Order 6750.16) ....................................... |
☐ Yes ☐ No |
||||||||||||||||||
Location(s): |
LOC: |
GS: |
|||||||||||||||||
D. Marker Beacons: (Ref. Order 6750.16) |
|||||||||||||||||||
(1) Outer Marker (OM) installed (not required): ....................................................... |
☐ Yes ☐ No |
||||||||||||||||||
(2) Middle Marker (MM) installed (not required): .................................................... |
☐ Yes ☐ No |
||||||||||||||||||
(3) Inner Marker (IM) installed (for “RA NA” CAT II operations): ......................... |
☐ Yes ☐ No |
||||||||||||||||||
E. Approach Light System (Ref. Order JO 6850.2) installed: ........................................ |
☐ Yes ☐ No |
||||||||||||||||||
(1) Monitored (Ref. Order 6750.24)? ......................................................................... |
☐ Yes ☐ No |
||||||||||||||||||
Submit Approach Light System Plan and Profile as-built drawings to the assigned AFS-400 member for forwarding to Aeronautical Information Services (AJV) if applicable to the project. |
|||||||||||||||||||
F. The LOC and GS critical areas are adequate to support CAT II/III operations: |
☐ Yes ☐ No |
||||||||||||||||||
(1) Are the LOC and GS critical areas standard (Ref. Order 6750.16)? ............ |
☐ Yes ☐ No |
||||||||||||||||||
(2) If critical areas are nonstandard, provide a description and attach critical area drawings:
|
|||||||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||||
|
|||||||||||||||||||
IV. Runway Visual Range (RVR) Equipment. RVR 1600, one sensor required; RVR 1200, two sensors required; runway exceeding 8000 feet and RVR below 1600 requires midpoint RVR in addition to touchdown zone (TDZ) and rollout; CAT III operations, three sensors required. (Ref. Orders 6750.24 and 6560.10.) |
|||||||||||||||||||
A. Installed in accordance with Order 6560.29: ............................................................. |
☐ Yes ☐ No |
||||||||||||||||||
B. Type equipment (Make/Model): |
|||||||||||||||||||
(1) Touchdown installed: ........................................................................................... |
☐ Yes ☐ No |
||||||||||||||||||
(2) Midpoint installed: ............................................................................................... |
☐ Yes ☐ No |
||||||||||||||||||
(3) Rollout installed: .................................................................................................. |
☐ Yes ☐ No |
||||||||||||||||||
(4) Far-End installed (not required): .......................................................................... |
☐ Yes ☐ No |
||||||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||||
V. Electrical Power Requirements. Indicate whether the following components meet CAT II standards for backup power and power transfer (Ref. Order 6950.2). (Enter “NA” if not installed.) |
|||||||||||||||||||
A. LOC ............................................................ |
☐ Yes ☐ No |
|
|||||||||||||||||
B. GS .............................................................. |
☐ Yes ☐ No |
|
|||||||||||||||||
C. OM ............................................................. |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||||
D. MM ............................................................. |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||||
E. IM ............................................................... |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||||
F. RVR (Touchdown) ..................................... |
☐ Yes ☐ No |
|
|||||||||||||||||
G. RVR (Midpoint) .......................................... |
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||||
H. RVR (Rollout) ............................................ | ..
☐ Yes ☐ No ☐ NA |
|
|||||||||||||||||
I. ALSF-1/2 .................................................... |
☐ Yes ☐ No |
|
|||||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||||
|
|||||||||||||||||||
VI. Siting Standards. Confirm the following Navigational Aids (NAVAID) meet siting standards (Ref. Order 6750.16): |
|||||||||||||||||||
LOC Antenna: |
☐ Yes ☐ No |
GS Mast/Antenna: |
☐ Yes ☐ No |
||||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||||||
VII. Additional Information: |
|||||||||||||||||||
A. List all approved and pending National Airspace System (NAS) Change Proposals (NCP) applicable to the facilities in this checklist (ILS, approach lights, RVR, etc.): |
|||||||||||||||||||
B. Indicate the AJW Systems Support Center and hours of coverage for qualified technicians on duty at the airport for this system: |
|||||||||||||||||||
|
|
|
|
|
|||||||||||||||
Category II/III Coordinator (Print) |
Signature |
Date |
|||||||||||||||||
|
|
|
|
|
|||||||||||||||
Manager or Authorized Representative, Service Area Operations Engineering Group (Print) |
Signature |
Date |
|||||||||||||||||
ATO AJT Checklist for CAT II/III Operations |
|||||||||||||||
Runway: |
Airport: |
City: |
State: |
||||||||||||
This checklist is to verify that the equipment for the runway listed above meets the requirements to provide the proposed CAT II/III approach and landing operations. |
|||||||||||||||
CAT II RVR 1600 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 700 (III/D/3): |
☐ Yes ☐ No |
||||||||||||
CAT II RVR 1200 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 600 (III/E/3): |
☐ Yes ☐ No |
||||||||||||
CAT II RVR 1000 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 300 (III/E/4): |
☐ Yes ☐ No |
||||||||||||
Completion of this checklist should reflect achieved/completed status, not planned actions. The checklist can be completed with items still in progress at the discretion of the assigned AFS-400 member. When all portions of this checklist are complete, please return the checklist expeditiously to the assigned AFS-400 member in order to preclude delay of CAT II/III service to the users. Once approval is granted, FS will issue authorization for CAT II/III operations. |
|||||||||||||||
I. General Information. Immediately upon initiation of this checklist, please provide the assigned AFS-400 member (listed below) with the name and telephone number of your staff member/point of contact for monitoring the accomplishment of your checklist. |
|||||||||||||||
AFS-400 Member: |
Phone Number: |
||||||||||||||
Alternate: |
Phone Number: |
||||||||||||||
|
|||||||||||||||
II. CAT II/III Operational Requirements. (Ref. Order JO 7210.3): |
|||||||||||||||
A. Letter of Agreement coordinated with the appropriate offices (i.e., AJW, ARP Division/District Office, FS, and Airport Authority). Please attach copy: ........................................................................................................... |
☐ Yes ☐ No |
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||
III. Monitor Capability and Coordination. (Ref. Order 6750.24): |
|||||||||||||||
A. Verify that monitoring capability exists in the Airport Traffic Control Tower (ATCT) for: |
|||||||||||||||
(1) Localizer (LOC): ....................................................................... |
☐ Yes ☐ No |
||||||||||||||
(2) Glideslope (GS): ....................................................................... |
☐ Yes ☐ No |
||||||||||||||
(3) Inner Marker (IM) (for RA NA operations): ............................ |
☐ Yes ☐ No ☐ NA |
||||||||||||||
B. Is an approved electrical monitoring system installed in the ATCT for the runway light system? ................................................................................................. |
☐ Yes ☐ No |
||||||||||||||
C. Is an approved electrical monitoring system installed in the ATCT for the approach light system? .............................................................................................. |
☐ Yes ☐ No |
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||
IV. Power Transfer. (Ref. Order 6750.24): |
|||||||||||||||
A. Arrangements exist to start engine generators for: |
|||||||||||||||
(1) RVR: ................................................................................................. |
☐ Yes ☐ No ☐ NA |
||||||||||||||
(2) Runway Lights (check all that apply): ................................. |
☐ HIRL ☐ TDZ ☐ RCL ☐ None |
||||||||||||||
(3) Approach light system and power vault (if ALSF installed): ................... |
☐ Yes ☐ No |
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||
V. Communications. |
|||||||||||||||
A. Positive Control of Aircraft and Ground Vehicles on Runway and ILS Critical Areas (Ref. AC 120-118, AC 150/5340-1, and Order JO 7110.65) .......................... |
☐ Yes ☐ No |
||||||||||||||
B. Indicate how facility outages and airport conditions (Ref. Orders JO 7110.65 and JO 7210.3) are reported (ATIS, NOTAM, etc.): ................................................ |
|
||||||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||||||
|
|
|
|
|
|||||||||||
Facility Air Traffic Manager or Authorized Representative (Print) |
Signature |
Date |
|||||||||||||
Airports Division Checklist for Special Authorization CAT II Operations |
|||||||||||
Runway: |
Airport: |
City: |
State: |
||||||||
This checklist is to verify that the equipment for the runway listed above meets the requirements to support the proposed CAT II/III approach and landing operations. |
|||||||||||
CAT II RVR 1600 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 700 (III/D/3): |
☐ Yes ☐ No |
||||||||
CAT II RVR 1200 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 600 (III/E/3): |
☐ Yes ☐ No |
||||||||
CAT II RVR 1000 (II/D/2): |
☐ Yes ☐ No |
CAT III RVR 300 (III/E/4): |
☐ Yes ☐ No |
||||||||
Confirm that all ground systems and obstacle clearance requirements are met. Completion of this checklist should reflect achieved/completed status, not planned actions. The checklist can be completed with items still in progress at the discretion of the assigned AFS-400 member. When all portions of this checklist are complete, please return the checklist expeditiously to the assigned AFS-400 member in order to preclude delay of CAT II/III service to the users. Once approval is granted, FS will issue authorization for CAT II/III operations. |
|||||||||||
I. General Information. Immediately upon initiation of this checklist, please provide the assigned AFS-400 member (listed below) with the name and telephone number of your staff member/point of contact for monitoring the accomplishment of the checklist. |
|||||||||||
AFS-400 Member: |
Phone Number: |
||||||||||
Alternate: |
Phone Number: |
||||||||||
|
|||||||||||
II. Lighting Aids. Indicate if the following visual aids meet installation standards. If a modification to an airport design standard was approved, list each approval in section VII. (Ref. AC 150/5340-30 and Order JO 6850.2.) |
|||||||||||
A. High Intensity Runway Edge Lights: .......................................................... |
☐ Yes ☐ No |
||||||||||
B. Threshold/Runway End Lights (in addition to threshold lights, which are integral to the approach light system): ........................................................ |
☐ Yes ☐ No |
||||||||||
C. Runway Centerline (RCL) Lights: ............................................................. |
☐ Yes ☐ No |
||||||||||
D. Runway Touchdown Zone (TDZ) Lights: .................................................. |
☐ Yes ☐ No |
||||||||||
E. ALSF-2 Approach Lights (if non-Federal): ................................................ |
☐ Yes ☐ No |
||||||||||
NOTE: For authorization less than RVR 1200, include a copy of the Surface Movement Guidance and Control System (SMGCS) plan and taxi chart with details of all required lighting aids (taxiway centerline (CL) lights, stop bars, etc.). |
|||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||
|
|||||||||||
III. Monitoring of Lighting Aids. (Ref. Order 6750.24.) |
|||||||||||
A. Arrangements for airport personnel to advise ATCT whenever the runway lighting system does not meet CAT II/III requirements: ............................. |
☐ Yes ☐ No |
||||||||||
B. Specify the organization responsible for remote monitoring and visual inspection of lighting components. Enter “none” if not installed: |
|||||||||||
Component |
Remote Monitor |
Visual Inspection |
|||||||||
(1) Runway Edge Lights: |
|
|
|||||||||
(2) RCL Lights: |
|
|
|||||||||
(3) Runway TDZ Lights: |
|
|
|||||||||
(4) Approach Lights (if non-Federal): |
|
|
|||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||
IV. Surface Markings and Signs Installed. (Ref. AC 150/5340-1, AC 150/5340-18, Order JO 7110.65, and Order 6750.16) |
|||||||||||
A. Precision Instrument Runway Markings: ................................................................. |
☐ Yes ☐ No |
||||||||||
B. Runway Holding Position Markings and Signs: ....................................................... |
☐ Yes ☐ No |
||||||||||
C. CAT II/III ILS Critical Areas Identified. ILS Critical Area Holding Position Markings and Signs: .................................................................................................. |
☐ Yes ☐ No |
||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||
V. Obstacle Clearance. Certification may be obtained from the airport sponsor. |
|||||||||||
A. Is the CAT II/III Obstacle Free Zone (OFZ) clear of obstructions? ........................ |
☐ Yes ☐ No |
||||||||||
B. If no, describe any obstacles that penetrate the CAT II/III OFZ:
|
|||||||||||
C. Approach Light Area: |
|||||||||||
(1) Approach light plane clear:.................................................................................. |
☐ Yes ☐ No |
||||||||||
(2) If light plane is not clear, describe any penetrations:
|
|||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||
VI. Electrical Power Requirements. (Ref. Order 6950.2.) Verify that the following components, if installed, meet the requirement for 1-second power transfer: |
|||||||||||
A. Threshold and Runway Edge Lights: ................... |
☐ Yes ☐ No |
||||||||||
B. RCL Lights: ......................................................... |
☐ Yes ☐ No |
||||||||||
C. TDZ Lights: ......................................................... |
☐ Yes ☐ No |
||||||||||
D. Approach Lights (if non-Federal): ....................... |
☐ Yes ☐ No |
||||||||||
This checklist should reflect current equipment. Describe any known deficiencies in this equipment that would affect potential CAT II-III operations and any planned equipment changes necessary for CAT II-III operations:
|
|||||||||||
VII. National Standards. List all approved and planned modifications to airport national design standards regarding the proposed runway and equipment, including those related to facility frangibility:
|
|||||||||||
|
|
|
|
|
|||||||
Manager or Authorized Representative, ADO (Print) |
Signature |
Date |
|||||||||
|
|
|
|
|
|||||||
Manager or Authorized Representative, |
Signature |
Date |
|||||||||
• Block I, General Data.
• Block II, Special Authorization CAT I Operations (latest version of FAA Order 8400.13, Chapter 3).
• Block III, Special Authorization CAT II Operations (latest version of FAA Order 8400.13, Chapter 5).
• Block IV, CAT II Tolerances Met (latest version of FAA Order 8200.1, Chapter 15).
• Block V, CAT III Tolerances Met (latest version of FAA Order 8200.1, Chapter 15).
I. |
General Data |
|
A |
Location: |
|
B |
Airport: |
|
C |
Runway Number: |
|
D |
Facility ID: |
|
E |
Runway Length (ft.) / Width (ft.): |
/ |
F |
Runway Gradient % +/-: |
|
G |
Runway Surface Type: |
|
H |
Runway Grooving: |
|
I |
Glideslope (GS) Angle (degrees): |
|
J |
Requested Standard (II thru V): |
|
II. |
Special Authorization CAT I Operations |
|
A |
Localizer (LOC) #1 Performance Classification: |
|
B |
Radio Altimeter (RA) Setting Height: |
|
C |
GS Clearance Below Path: |
☐ Sat ☐ Unsat |
D |
Missed Approach: |
☐ Sat ☐ Unsat |
E |
MALSR or Better: |
☐ Yes ☐ No |
III. |
Special Authorization CAT II Operations |
|
A |
LOC #1 (CAT II/D Minimum): |
|
B |
LOC Performance Classification: |
|
C |
GS #1 (CAT II Criteria): |
|
D |
RA Setting Height: |
|
E |
RDH Crossing Height: |
|
F |
ARDH Crossing Height: |
|
G |
CAT II ILS SIAP: |
☐ Yes ☐ No |
H |
Missed Approach: |
☐ Sat ☐ Unsat |
I |
MALSR or Better: |
☐ Yes ☐ No |
IV. |
CAT II Tolerances Met |
|
A |
LOC #2 (CAT II/D Minimum): |
|
B |
GS #2 (CAT II Criteria): |
|
C |
ALSF-2 Lights: |
☐ Yes ☐ No |
V. |
CAT III Tolerances Met |
|
A |
LOC #1 (CAT III/D or III/E Minimum): |
☐ III/D ☐ III/E |
B |
LOC #2 (CAT III/D or III/E Minimum): |
☐ III/D ☐ III/E |
C |
CAT III SIAP: |
☐ Yes ☐ No |
POSITION |
DATE |
SIGNATURE |
Chief of Flight Inspection Activity |
|
|
Operations ILS Category Coordinator |
|
|
Directive Feedback Information
Please submit any written comments or recommendation for improving this directive, or suggest new items or subjects to be added to it. Also, if you find an error, please tell us about it.
Subject: FAA Order 8400.13F, Procedures for the Evaluation and Approval of Facilities for Special Authorization Category I Operations and All Category II and III Operations
To: Flight Standards Directive Management Officer, AFB-120 Directives
Mailbox
(9-AWA-AFB-120-Directives@faa.gov)
(Please check all appropriate line items)
An error (procedural or typographical) has been noted in paragraph ___________ on
page _____________ .
Recommend paragraph _____________ on page __________ be changed as follows:
(attach separate sheet if necessary)
In a future change to this order, please cover the following subject:
(briefly describe what you want added)
Other comments:
I would like to discuss the above. Please contact me.
Submitted by: __________________________________ Date: ______________
Telephone Number:___________________ Routing Symbol:_______________
FAA Form 1320-19 (10-98)