|
||||||
Summary Information | ||||||
|
||||||
|
Questions | Answers | Comments | |||||||
---|---|---|---|---|---|---|---|---|---|
4.7.1 (AW) Control of Calibrated Tools & Test Equipment | |||||||||
1
Does the process design ensure the individual with responsibility provides both financial and human resources for the safety and quality performance of this element?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Management Responsibility, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:46 PM, QID: 00051929, Response Details: Responsibility ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
2
Does the process design ensure the individual with responsibility provides both financial and human resources for the safety and quality performance of this element?
Safety Attribute: Management Responsibility, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:48 PM, QID: 00051943, Response Details: Responsibility ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
3
Is the person with authority clearly identifiable, qualified and knowledgeable to effectively plan, direct and control resources, change procedures and make key determinations including safety risk acceptance decisions for this element?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Management Authority, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:48 PM, QID: 00051930, Response Details: Authority ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
4
Is the person with authority clearly identifiable, qualified and knowledgeable to effectively plan, direct and control resources, change procedures and make key determinations including safety risk acceptance decisions for this element?
Safety Attribute: Management Authority, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:48 PM, QID: 00051944, Response Details: Authority ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
5
Do process measurement(s) exist to evaluate the performance of this element and implement corrective action if necessary?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:48 PM, QID: 00051931, Response Details: Process Measurement ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
6
Do process measurement(s) exist to evaluate the performance of this element and implement corrective action if necessary?
Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:48 PM, QID: 00051945, Response Details: Process Measurement ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
7
Do procedures exist in enough detail to meet the regulatory and guidance requirements for this element to produce the intended results?
Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:46 PM, QID: 00051926, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||
8
Do procedures exist in enough detail to meet the regulatory and guidance requirements for this element to produce the intended results?
Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:47 PM, QID: 00051940, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||
9
Does the pilot school have a method to ensure that the maintenance personnel use the tools, equipment, and test apparatus necessary to assure completion of the work in accordance with accepted industry practices?
REFERENCES: 91.403(a), 91.405, 43.13(a) NOTE: If special equipment or test apparatus is recommended by the manufacturer involved, he must use that equipment or apparatus or its equivalent acceptable to the Administrator. Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "141") AND (MAINTENANCE FUNCTIONS = "PERFORMS MAINTENANCE IN-HOUSE") , Rev. 1 10/17/2018 10:57:49 AM, QID: 00053571, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||
10
Does the pilot school have a method to ensure that persons performing maintenance on their aircraft use calibrated tools and equipment, traceable to one of the following:
#1 A standard acceptable to the FAA; #2 NIST; #3 Manufacturer's standards; or #4 If foreign-manufactured, the standards of the country where manufactured, if acceptable to the Administrator? REFERENCES: 91.405, 43.13(a), 8900.1 Vol 6 Ch 7 Sec 2 Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "141") AND (MAINTENANCE FUNCTIONS = "PERFORMS MAINTENANCE IN-HOUSE") , Rev. 2 6/25/2019 10:58:49 AM, QID: 00053575, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||
11
Do controls exist within this element that ensure risks are reduced to an acceptable level?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Controls, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:46 PM, QID: 00051927, Response Details: Controls ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
12
Do controls exist within this element that ensure risks are reduced to an acceptable level?
Safety Attribute: Controls, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:47 PM, QID: 00051941, Response Details: Controls ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
13
Does the certificate holder have a method to evaluate the impact of changes on related processes (interfaces) for this element?
Safety Attribute: Interfaces, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:46 PM, QID: 00051928, Response Details: Interfaces ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
14
Does the certificate holder have a method to evaluate the impact of changes on related processes (interfaces) for this element?
Safety Attribute: Interfaces, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:47 PM, QID: 00051942, Response Details: Interfaces ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
15
Does the process design require that individuals understand their safety role and how it contributes to the safety performance of this element?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Safety Ownership, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:46 PM, QID: 00051932, Response Details: Safety Ownership ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||
16
Does the process design require that individuals understand their safety role and how it contributes to the safety performance of this element?
Safety Attribute: Safety Ownership, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/8/2019 12:47:48 PM, QID: 00051946, Response Details: Safety Ownership ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
Response Details List Authority ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Process oversight failure |
2 | Unacceptable safety risk acceptance |
3 | Ineffective planning of resources |
4 | Ineffective use of resources |
5 | Ineffective control of resources |
6 | Failure to implement safety risk processes |
7 | Process owner not clearly identified |
8 | Unqualified |
9 | Other |
Response Details List Controls ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Failure to identify hazards or ineffective risk controls |
2 | Failure to develop and maintain risk controls |
3 | Failure to effectively mitigate risk before applying risk controls |
4 | Risk controls ineffective |
5 | Unclear risk controls |
6 | Failure to assess risk for a new system |
7 | Failure to assess risk when revising an existing system |
8 | Failure to assess risk when developing operational procedures |
9 | Failure to maintain records of outputs of risk control assessments |
10 | Other |
Response Details List EP & ED DCTs (Both OP and AW) (Released, 1.0) | |
1 | Unclear procedure(s) |
2 | Conflicting procedure(s) |
3 | Used workaround(s) |
4 | Skipped process step(s) |
5 | Personnel failed to follow process (procedures, guidance, etc) |
6 | Procedures/guidance not available |
7 | Procedures/guidance not current |
8 | Inconsistent procedure(s) |
9 | Undocumented procedure(s) |
10 | Minor typographical error(s) (i.e. record entries) |
11 | Information missing |
12 | Communication failure(s) |
13 | Personnel failed to perform task |
14 | Process failed to meet desired outcome |
15 | Process oversight failure |
16 | Equipment/tools not available |
17 | Equipment/tools not adequate |
18 | Equipment/tools not calibrated |
19 | Facilities not adequate |
20 | Other |
Response Details List Interfaces ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Internal communication failure(s) |
2 | External communication failure(s) |
3 | Lack of interfaces |
4 | Inconsistent interfaces |
5 | Poor coordination between departments and employees |
6 | Failure of interfaces between processes or procedures |
7 | Other |
Response Details List Process Measurement ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Inadequate monitoring of operations processes |
2 | Ineffective evaluations of processes or systems |
3 | Undocumented or insufficient investigations |
4 | Failure to conduct audits |
5 | Ineffective audits |
6 | Failure to detect changes in the operational environment |
7 | Personnel failed to perform/follow process (procedures, guidance, etc.) |
8 | Process failed to meet desired outcome |
9 | Process oversight failure |
10 | Other |
Response Details List Responsibility ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Failed to provide financial resources |
2 | Failed to provide sufficient human resources |
3 | Individual not clearly identified |
4 | Failure to ensure safety of process |
5 | Failure to oversee operations conducted under the certificate |
6 | Failed to ensure quality performance of process |
7 | Process oversight failure |
8 | Communication failure(s) |
9 | Other |
Response Details List N/A Response Detail (Released, 2.0) | |
1 | Not applicable or authorized for the certificate holder or applicant |
2 | Other |
Response Details List Safety Ownership ED/EP/SP DCTs (Both OP and AW) (Released, 3.0) | |
1 | Unaware of or ineffective safety policies or processes |
2 | Unaware of or ineffective safety related reporting tools |
3 | Unclear safety policy |
4 | Ineffective safety related training |
5 | Lack of safety culture |
6 | Unclear safety objectives |
7 | Other |