|
||||||||||||
Summary Information | ||||||||||||
|
||||||||||||
|
Questions | Answers | Comments | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
3.2.1 (OP) Aircraft Performance Operating Limitations | |||||||||||||
1
Did the certificate holder meet its regulatory and guidance requirements for Aircraft Performance Operating Limitations?
REFERENCES: 8900.1 Vol 3 Ch 25 Sec 5, 8900.1 Vol 4 Ch 3 Sec 1, 8900.1 Vol 4 Ch 3 Sec 2, 8900.1 Vol 4 Ch 3 Sec 5, 135 Subpart I, 135.181, 135.183, 135.211 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 10 9/29/2021 10:31:42 AM, QID: 00013514, Response Details: Procedures SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
3.2.2 (OP) Use of Approved Areas, Routes, and Airports | |||||||||||||
2
Did the certificate holder meet its regulatory and guidance requirements for Use of Approved Areas, Routes, and Airports?
REFERENCES: 8900.1 Vol 3 Ch 18 Sec 5, 8900.1 Vol 3 Ch 18 Sec 7, A057, A014, A021, B032, B050, B450, C049, C070, B048, B049, B057, C080, H107, 119.49(a), H123, 135.3(a), 91.703, 135.229, 135.385(f), 136.1 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 16 12/30/2021 11:54:51 AM, QID: 00013521, Response Details: Procedures SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
3.2.3 (OP) Special Navigation Areas of Operation | |||||||||||||
3
Did the certificate holder meet its regulatory and guidance requirements for Special Navigation Areas of Operation?
REFERENCES: B036, B037, B038, B039, B040, B050, B054, 8900.1 Vol 4 Ch 1 Sec 5, 135.23, 135.99, 91.703, 91.705 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135") AND ((OPSPEC = "B036") OR (OPSPEC = "B037") OR (OPSPEC = "B038") OR (OPSPEC = "B039") OR (OPSPEC = "B040") OR (OPSPEC = "B059") OR (OPSPEC = "B055") OR (AREA OF OPERATION = "POLAR AREA - SOUTH")) , Rev. 9 3/29/2019 8:22:54 AM, QID: 00013528, Response Details: Procedures SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
3.2.4 (OP) RVSM Authorization | |||||||||||||
4
Did the certificate holder meet its regulatory and guidance requirements for RVSM Authorization?
REFERENCES: AC-91-85, B046, 91 Appendix G, 91.180 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135") AND (OPSPEC = "B046") , Rev. 3 3/29/2019 8:22:42 AM, QID: 00050298, Response Details: Procedures SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
Safety Attributes | |||||||||||||
5
Did the certificate holder's controls effectively mitigate unacceptable levels of risk(s) for the Flight Operations Engineering process?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this Subsystem. Safety Attribute: Controls, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 6 9/29/2020 1:40:10 PM, QID: 00013515, Response Details: Controls ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
6
Did the certificate holder's Flight Operations Engineering process ensure consistency of related processes between departments and employees (interfaces)?
NOTE: This question applies to all Elements within this Subsystem. Safety Attribute: Interfaces, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 6 9/29/2020 1:40:10 PM, QID: 00013516, Response Details: Interfaces ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
7
Were financial and human resources provided to ensure the safety and quality performance for the Flight Operations Engineering process?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this Subsystem. Safety Attribute: Responsibility, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 6 9/29/2020 1:40:10 PM, QID: 00013517, Response Details: Responsibility ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
8
Did the person with authority over the certificate holder's Flight Operations Engineering process effectively plan, direct, control, or change procedures, and make key determinations, including safety risk acceptance decisions?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this Subsystem. Safety Attribute: Authority, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 7 9/29/2020 1:40:10 PM, QID: 00013518, Response Details: Authority ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
9
Were the certificate holder's process measurement(s) used to evaluate the performance of the Flight Operations Engineering process and if necessary, implement corrective action?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this Subsystem. Safety Attribute: Process Measurement, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 6 9/29/2020 1:40:10 PM, QID: 00013519, Response Details: Process Measurement ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
10
Did the certificate holder's personnel understand their role and contribute to the safety performance of the Flight Operations Engineering process?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this Subsystem. Safety Attribute: Safety Ownership, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135") , Rev. 5 9/29/2020 1:40:11 PM, QID: 00013520, Response Details: Safety Ownership ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
Response Details List Authority ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Process oversight failure |
2 | Unacceptable safety risk acceptance |
3 | Ineffective planning of resources |
4 | Ineffective use of resources |
5 | Ineffective control of resources |
6 | Failure to implement safety risk processes |
7 | Process owner not clearly identified |
8 | Unqualified |
9 | Other |
Response Details List Controls ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Failure to identify hazards or ineffective risk controls |
2 | Failure to develop and maintain risk controls |
3 | Failure to effectively mitigate risk before applying risk controls |
4 | Risk controls ineffective |
5 | Unclear risk controls |
6 | Failure to assess risk for a new system |
7 | Failure to assess risk when revising an existing system |
8 | Failure to assess risk when developing operational procedures |
9 | Failure to maintain records of outputs of risk control assessments |
10 | Other |
Response Details List Interfaces ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Internal communication failure(s) |
2 | External communication failure(s) |
3 | Lack of interfaces |
4 | Inconsistent interfaces |
5 | Poor coordination between departments and employees |
6 | Failure of interfaces between processes or procedures |
7 | Other |
Response Details List Procedures SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Unclear procedure(s) |
2 | Conflicting procedure(s) |
3 | Used workaround(s) |
4 | Skipped process step(s) |
5 | Personnel failed to follow process (procedures, guidance, etc) |
6 | Procedures/guidance not available |
7 | Procedures/guidance not current |
8 | Inconsistent procedure(s) |
9 | Undocumented procedure(s) |
10 | Minor typographical error(s) (i.e. record entries) |
11 | Information missing |
12 | Communication failure(s) |
13 | Personnel failed to perform task |
14 | Process failed to meet desired outcome |
15 | Process oversight failure |
16 | Equipment/tools not available |
17 | Equipment/tools not adequate |
18 | Equipment/tools not calibrated |
19 | Facilities not adequate |
20 | Other |
Response Details List Process Measurement ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Inadequate monitoring of operations processes |
2 | Ineffective evaluations of processes or systems |
3 | Undocumented or insufficient investigations |
4 | Failure to conduct audits |
5 | Ineffective audits |
6 | Failure to detect changes in the operational environment |
7 | Personnel failed to perform/follow process (procedures, guidance, etc.) |
8 | Process failed to meet desired outcome |
9 | Process oversight failure |
10 | Other |
Response Details List Responsibility ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Failed to provide financial resources |
2 | Failed to provide sufficient human resources |
3 | Individual not clearly identified |
4 | Failure to ensure safety of process |
5 | Failure to oversee operations conducted under the certificate |
6 | Failed to ensure quality performance of process |
7 | Process oversight failure |
8 | Communication failure(s) |
9 | Other |
Response Details List N/O Response Detail (Released, 2.0) | |
1 | Personnel (e.g., key certificate holder personnel not present/available) |
2 | Equipment (e.g., equipment not present/available/in serviceable condition) |
3 | Event did not occur (e.g., did not observe an intoxicated passenger on the flight) |
4 | Time Constraints (e.g., resources/workload) |
5 | Weather (e.g., weather needed for observation not present or weather made observation impossible) |
6 | Other |
Response Details List Safety Ownership ED/EP/SP DCTs (Both OP and AW) (Released, 3.0) | |
1 | Unaware of or ineffective safety policies or processes |
2 | Unaware of or ineffective safety related reporting tools |
3 | Unclear safety policy |
4 | Ineffective safety related training |
5 | Lack of safety culture |
6 | Unclear safety objectives |
7 | Other |