|
||||||||||
Summary Information | ||||||||||
|
||||||||||
|
Questions | Answers | Comments | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
5.2 Cabin Operations | |||||||||||||
1
Did the certificate holder meet its regulatory and guidance requirements for Crewmember Duties/Cabin Procedures?
REFERENCES: AC-120-48, AC-120-51, AC-120-71, AC-120-88, AC-120-95, 8900.1 Vol 3 Ch 18 Sec 3, 8900.1 Vol 3 Ch 32 Sec 13, 8900.1 Vol 3 Ch 32 Sec 3, 8900.1 Vol 3 Ch 33 Sec 3, 8900.1 Vol 3 Ch 33 Sec 6, A021, A061, AC-120-76, 8900.1 Vol 4 Ch 15 Sec 1, 8900.1 Vol 4 Ch 5 Sec 3, AC-91.21-1, 8900.1 Vol 3 Ch 66 Sec 1, 135.621(a), 135.621(b), 135.621(c), 8900.1 Vol 4 Ch 15 Sec 2, 135.100(b), 135.117(a), 135.117(b), 135.117(e), 135.120, 135.122(a), 135.122(b), 135.122(c), 135.123(a), 135.123(b), 135.128(a), 135.21(a), 135.21(d), 135.21(e), 135.21(f), 135.65(b), 135.87(c), AC-121-24, AC-121-29, AC-135-14, AC-135-15, 135.144 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135") , Rev. 16 9/29/2021 10:40:40 AM, QID: 00017922, Response Details: Procedures SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
2
Did the certificate holder meet its regulatory and guidance requirements for Carry-on Baggage?
REFERENCES: AC-120-27, AC-120-95, 8900.1 Vol 3 Ch 18 Sec 3, 8900.1 Vol 3 Ch 32 Sec 13, 8900.1 Vol 3 Ch 33 Sec 6, A011, 121.285(c), 135.91(f), 121.589(a), 121.589(b), 121.589(c), 121.589(d), 121.589(e), 121.589(f), 121.589(g), 135.87(a), 135.87(b), 135.87(c), 135.87(d), AC-121-29 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: FAR PART = "135" , Rev. 14 12/28/2021 9:34:13 AM, QID: 00017923, Response Details: Procedures SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
3
Did the certificate holder meet its regulatory and guidance requirements for Passenger Handling?
REFERENCES: AC-120-87, 8900.1 Vol 14 Ch 2 Sec 1, 8900.1 Vol 3 Ch 33 Sec 6, 8900.1 Vol 3 Ch 57 Sec 1, 8900.1 Vol 4 Ch 5 Sec 3, 135.91(f), 13.305, 135.113, 135.117(e), 135.119, 135.120, 135.121(a), 135.121(b), 135.121(c), 135.127, 135.127(a), 135.127(b), 135.127(d), 135.127(f), 135.127(h), 135.128(a), 135.23(j), 135.23(q), 135.85, 135.91, 135.91(a), 135.91(b), 135.91(c), 135.91(d), 135.91(e), 110.2, AC-121-24, AC-135-14, AC-135-15, 135.121 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135") AND NOT (A/C CATEGORY = "UAS ONLY") , Rev. 9 9/29/2020 1:34:42 PM, QID: 00017924, Response Details: Procedures SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
Safety Attributes | |||||||||||||
4
Did the certificate holder's controls effectively mitigate unacceptable levels of risk(s) for the Onboard Operations processes?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this System. Safety Attribute: Controls, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 6 9/29/2020 1:34:37 PM, QID: 00017925, Response Details: Controls ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
5
Did the certificate holder's Onboard Operations processes ensure consistency of related processes between departments and employees (interfaces)?
NOTE: This question applies to all Elements within this System. Safety Attribute: Interfaces, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 6 9/29/2020 1:34:38 PM, QID: 00017926, Response Details: Interfaces ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
6
Were financial and human resources provided to ensure the safety and quality performance for the Onboard Operations processes?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this System. Safety Attribute: Responsibility, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) , Rev. 6 9/29/2020 1:34:36 PM, QID: 00017927, Response Details: Responsibility ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
7
Did the person with authority over the certificate holder's Onboard Operations processes effectively plan, direct, control, or change procedures, and make key determinations, including safety risk acceptance decisions?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this System. Safety Attribute: Authority, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135") , Rev. 7 9/29/2020 1:34:36 PM, QID: 00017928, Response Details: Authority ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
8
Were the certificate holder's process measurement(s) used to evaluate the performance of the Onboard Operations processes and if necessary, implement corrective action?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this System. Safety Attribute: Process Measurement, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135") , Rev. 6 9/29/2020 1:34:37 PM, QID: 00018658, Response Details: Process Measurement ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
9
Did the certificate holder's personnel understand their role and contribute to the safety performance of the Onboard Operations processes?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 NOTE: This question applies to all Elements within this System. Safety Attribute: Safety Ownership, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135") , Rev. 6 9/29/2020 1:34:35 PM, QID: 00017912, Response Details: Safety Ownership ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
Response Details List Authority ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Process oversight failure |
2 | Unacceptable safety risk acceptance |
3 | Ineffective planning of resources |
4 | Ineffective use of resources |
5 | Ineffective control of resources |
6 | Failure to implement safety risk processes |
7 | Process owner not clearly identified |
8 | Unqualified |
9 | Other |
Response Details List Controls ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Failure to identify hazards or ineffective risk controls |
2 | Failure to develop and maintain risk controls |
3 | Failure to effectively mitigate risk before applying risk controls |
4 | Risk controls ineffective |
5 | Unclear risk controls |
6 | Failure to assess risk for a new system |
7 | Failure to assess risk when revising an existing system |
8 | Failure to assess risk when developing operational procedures |
9 | Failure to maintain records of outputs of risk control assessments |
10 | Other |
Response Details List Interfaces ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Internal communication failure(s) |
2 | External communication failure(s) |
3 | Lack of interfaces |
4 | Inconsistent interfaces |
5 | Poor coordination between departments and employees |
6 | Failure of interfaces between processes or procedures |
7 | Other |
Response Details List Procedures SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Unclear procedure(s) |
2 | Conflicting procedure(s) |
3 | Used workaround(s) |
4 | Skipped process step(s) |
5 | Personnel failed to follow process (procedures, guidance, etc) |
6 | Procedures/guidance not available |
7 | Procedures/guidance not current |
8 | Inconsistent procedure(s) |
9 | Undocumented procedure(s) |
10 | Minor typographical error(s) (i.e. record entries) |
11 | Information missing |
12 | Communication failure(s) |
13 | Personnel failed to perform task |
14 | Process failed to meet desired outcome |
15 | Process oversight failure |
16 | Equipment/tools not available |
17 | Equipment/tools not adequate |
18 | Equipment/tools not calibrated |
19 | Facilities not adequate |
20 | Other |
Response Details List Process Measurement ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Inadequate monitoring of operations processes |
2 | Ineffective evaluations of processes or systems |
3 | Undocumented or insufficient investigations |
4 | Failure to conduct audits |
5 | Ineffective audits |
6 | Failure to detect changes in the operational environment |
7 | Personnel failed to perform/follow process (procedures, guidance, etc.) |
8 | Process failed to meet desired outcome |
9 | Process oversight failure |
10 | Other |
Response Details List Responsibility ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Failed to provide financial resources |
2 | Failed to provide sufficient human resources |
3 | Individual not clearly identified |
4 | Failure to ensure safety of process |
5 | Failure to oversee operations conducted under the certificate |
6 | Failed to ensure quality performance of process |
7 | Process oversight failure |
8 | Communication failure(s) |
9 | Other |
Response Details List N/O Response Detail (Released, 2.0) | |
1 | Personnel (e.g., key certificate holder personnel not present/available) |
2 | Equipment (e.g., equipment not present/available/in serviceable condition) |
3 | Event did not occur (e.g., did not observe an intoxicated passenger on the flight) |
4 | Time Constraints (e.g., resources/workload) |
5 | Weather (e.g., weather needed for observation not present or weather made observation impossible) |
6 | Other |
Response Details List Safety Ownership ED/EP/SP DCTs (Both OP and AW) (Released, 3.0) | |
1 | Unaware of or ineffective safety policies or processes |
2 | Unaware of or ineffective safety related reporting tools |
3 | Unclear safety policy |
4 | Ineffective safety related training |
5 | Lack of safety culture |
6 | Unclear safety objectives |
7 | Other |