|
||||||
Summary Information | ||||||
|
||||||
|
Questions | Answers | Comments | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1.1.2 (OP) Safety Program (Ground and Flight) | |||||||||||||
1
Best describe how the Operators safety structure identified hazards and controlled risk in flight, maintenance, and ground operations.
REFERENCES: 8900.1 Vol 3 Ch 28 Sec 1, AC-120-59 Safety Attribute: Process Measurement, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "IEP" ) , Rev. 2 7/17/2014 4:35:52 PM, QID: 00011000, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
2
Best describe how the Operator processed voluntary safety reports within the ASAP.
REFERENCES: 8900.1 Vol 11 Ch 2 Sec 1, AC-120-66 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "ASAP" ) , Rev. 2 7/17/2014 4:35:55 PM, QID: 00011012, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
3
Best describe how the Operator used the following four basic elements of the FOQA program to identify and correct deficiencies in all areas of flight operations:
#1 Airborne Data Recording Systems; #2 Data Transmittal Systems; #3 Data Analysis Systems; and #4 FOQA Organizational Structure. REFERENCES: 8900.1 Vol 11 Ch 2 Sec 2, AC-120-82 Safety Attribute: Procedures, Question Type: Process Observation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "FOQA" ) , Rev. 2 7/17/2014 4:35:56 PM, QID: 00011013, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
4
Were financial and human resources provided to ensure the safety and quality performance of this element?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Management Responsibility, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:44 AM, QID: 00051936, Response Details: Responsibility ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
5
Were financial and human resources provided to ensure the safety and quality performance of this element?
Safety Attribute: Management Responsibility, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051950, Response Details: Responsibility ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
6
Did the person with authority over the certificate holder's process effectively plan, direct and control resources, or change procedures and make key determinations including safety risk acceptance decisions for this element?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Management Authority, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051937, Response Details: Authority ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
7
Did the person with authority over the certificate holder's process effectively plan, direct and control resources, or change procedures and make key determinations including safety risk acceptance decisions for this element?
Safety Attribute: Management Authority, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:44 AM, QID: 00051951, Response Details: Authority ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
8
Does the Operator conduct safety audits and inspections?
REFERENCES: 8900.1 Vol 3 Ch 28 Sec 1, AC-120-59 Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "IEP" ) , Rev. 3 7/17/2014 4:35:53 PM, QID: 00011001, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
9
Were the operations monitoring and trend analysis programs used?
REFERENCES: 8900.1 Vol 3 Ch 28 Sec 1, AC-120-59 Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "IEP" ) , Rev. 3 7/17/2014 4:35:53 PM, QID: 00011002, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
10
Were identified safety concerns communicated to the appropriate parties?
REFERENCES: 8900.1 Vol 3 Ch 28 Sec 1, AC-120-59 Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "IEP" ) , Rev. 3 7/17/2014 4:35:54 PM, QID: 00011003, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
11
Were employees and contractors provided with safety awareness information and safety awareness education?
REFERENCES: 8900.1 Vol 3 Ch 28 Sec 1, AC-120-59 Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "IEP" ) , Rev. 3 7/17/2014 4:35:54 PM, QID: 00011004, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
12
Does the Operator have a written emergency response plan?
REFERENCES: 8900.1 Vol 3 Ch 28 Sec 1, AC-120-59 Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "IEP" ) , Rev. 3 7/17/2014 4:35:57 PM, QID: 00011019, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
13
Were the certificate holder's process measurement(s) used to evaluate the performance of this element and if necessary, implement corrective action?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:44 AM, QID: 00051938, Response Details: Process Measurement ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
14
Were the certificate holder's process measurement(s) used to evaluate the performance of this element and if necessary, implement corrective action?
Safety Attribute: Process Measurement, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:44 AM, QID: 00051952, Response Details: Process Measurement ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
15
Does the Operator have a voluntary IEP that actively identifies hazards to control risks associated with flight, maintenance, and ground operations?
REFERENCES: 8900.1 Vol 3 Ch 28 Sec 1, AC-120-59 Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" ) AND ( SAFETY PROGRAMS = "IEP" ) , Rev. 2 7/17/2014 4:35:57 PM, QID: 00011018, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
16
Were the operations monitoring and trend analysis programs used in accordance with the FOQA program?
REFERENCES: 8900.1 Vol 11 Ch 2 Sec 2, AC-120-82 Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135") AND (SAFETY PROGRAMS = "FOQA") , Rev. 1 3/29/2014 7:22:41 AM, QID: 00025607, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
17
Did the certificate holder follow VDRP procedures that met the intent of Advisory Circular 00-58?
REFERENCES: 8900.1 Vol 11 Ch 1 Sec 1, AC-00-58 Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135") AND (SAFETY PROGRAMS = "VDRP") , Rev. 1 7/7/2017 4:50:32 PM, QID: 00051211, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
18
Did the certificate holder follow policies, procedures, instructions and information for this element?
Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051933, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
19
Did the certificate holder follow policies, procedures, instructions and information for this element?
Safety Attribute: Procedures, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051947, Response Details: EP & ED DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
20
Did the controls effectively mitigate unacceptable risk(s) for this element?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Controls, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051934, Response Details: Controls ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
21
Did the controls effectively mitigate unacceptable risk(s) for this element?
Safety Attribute: Controls, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051948, Response Details: Controls ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
22
Were the certificate holder's interfaces effective for this element?
Safety Attribute: Interfaces, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051935, Response Details: Interfaces ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
23
Were the certificate holder's interfaces effective for this element?
Safety Attribute: Interfaces, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051949, Response Details: Interfaces ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
24
Did individuals understand their role and contribute to the safety performance of this element?
REFERENCES: AC-120-92, 8900.1 Vol 17 Ch 3 Sec 3 Safety Attribute: Safety Ownership, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:43 AM, QID: 00051939, Response Details: Safety Ownership ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
|||||||||||
25
Did individuals understand their role and contribute to the safety performance of this element?
Safety Attribute: Safety Ownership, Question Type: Output Validation, Scoping Attribute: (FAR PART = "135" OR "145" OR "141" OR "142" OR "147") AND NOT (SAFETY PROGRAMS = "SMSVP") , Rev. 2 3/15/2019 9:08:44 AM, QID: 00051953, Response Details: Safety Ownership ED/EP/SP DCTs (Both OP and AW), Status: Released |
|
|
Response Details List Responsibility ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Failed to provide financial resources |
2 | Failed to provide sufficient human resources |
3 | Individual not clearly identified |
4 | Failure to ensure safety of process |
5 | Failure to oversee operations conducted under the certificate |
6 | Failed to ensure quality performance of process |
7 | Process oversight failure |
8 | Communication failure(s) |
9 | Other |
Response Details List Authority ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Process oversight failure |
2 | Unacceptable safety risk acceptance |
3 | Ineffective planning of resources |
4 | Ineffective use of resources |
5 | Ineffective control of resources |
6 | Failure to implement safety risk processes |
7 | Process owner not clearly identified |
8 | Unqualified |
9 | Other |
Response Details List Process Measurement ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Inadequate monitoring of operations processes |
2 | Ineffective evaluations of processes or systems |
3 | Undocumented or insufficient investigations |
4 | Failure to conduct audits |
5 | Ineffective audits |
6 | Failure to detect changes in the operational environment |
7 | Personnel failed to perform/follow process (procedures, guidance, etc.) |
8 | Process failed to meet desired outcome |
9 | Process oversight failure |
10 | Other |
Response Details List Safety Ownership ED/EP/SP DCTs (Both OP and AW) (Released, 3.0) | |
1 | Unaware of or ineffective safety policies or processes |
2 | Unaware of or ineffective safety related reporting tools |
3 | Unclear safety policy |
4 | Ineffective safety related training |
5 | Lack of safety culture |
6 | Unclear safety objectives |
7 | Other |
Response Details List EP & ED DCTs (Both OP and AW) (Released, 1.0) | |
1 | Unclear procedure(s) |
2 | Conflicting procedure(s) |
3 | Used workaround(s) |
4 | Skipped process step(s) |
5 | Personnel failed to follow process (procedures, guidance, etc) |
6 | Procedures/guidance not available |
7 | Procedures/guidance not current |
8 | Inconsistent procedure(s) |
9 | Undocumented procedure(s) |
10 | Minor typographical error(s) (i.e. record entries) |
11 | Information missing |
12 | Communication failure(s) |
13 | Personnel failed to perform task |
14 | Process failed to meet desired outcome |
15 | Process oversight failure |
16 | Equipment/tools not available |
17 | Equipment/tools not adequate |
18 | Equipment/tools not calibrated |
19 | Facilities not adequate |
20 | Other |
Response Details List N/O Response Detail (Released, 2.0) | |
1 | Personnel (e.g., key certificate holder personnel not present/available) |
2 | Equipment (e.g., equipment not present/available/in serviceable condition) |
3 | Event did not occur (e.g., did not observe an intoxicated passenger on the flight) |
4 | Time Constraints (e.g., resources/workload) |
5 | Weather (e.g., weather needed for observation not present or weather made observation impossible) |
6 | Other |
Response Details List N/A Response Detail (Released, 2.0) | |
1 | Not applicable or authorized for the certificate holder or applicant |
2 | Other |
Response Details List Controls ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Failure to identify hazards or ineffective risk controls |
2 | Failure to develop and maintain risk controls |
3 | Failure to effectively mitigate risk before applying risk controls |
4 | Risk controls ineffective |
5 | Unclear risk controls |
6 | Failure to assess risk for a new system |
7 | Failure to assess risk when revising an existing system |
8 | Failure to assess risk when developing operational procedures |
9 | Failure to maintain records of outputs of risk control assessments |
10 | Other |
Response Details List Interfaces ED/EP/SP DCTs (Both OP and AW) (Released, 1.0) | |
1 | Internal communication failure(s) |
2 | External communication failure(s) |
3 | Lack of interfaces |
4 | Inconsistent interfaces |
5 | Poor coordination between departments and employees |
6 | Failure of interfaces between processes or procedures |
7 | Other |